Yes, in almost every case. Building Regulations treat a new mezzanine floor in commercial premises in England as building work, because it adds a structure people walk on and changes how they escape in a fire. You need approval from Building Control before installation starts, whether the floor is for storage, offices or retail.

At a glance:

  • Almost all mezzanine floors need Building Regulations approval, separate from planning permission.
  • In commercial buildings, a full plans application is required rather than a building notice.
  • Structure, fire safety, escape routes, edge protection and access are the main areas checked.
  • Fire safety usually decides the number of staircases and whether steelwork needs protection.
  • After completion, keep the certificate and review your fire risk assessment.

Which Building Regulations apply to a mezzanine floor?

Several Approved Documents apply at once, covering structure, fire, falls and access. That is why Building Control needs to check the full design, not just the steelwork. As of 2026, the parts most often involved in England are:

  • Approved Document A (Structure): the steelwork, connections, decking and the existing floor slab must safely carry the loads the mezzanine is designed for.
  • Approved Document B (Fire safety): means of escape, travel distances, the number and position of staircases, and whether the structure needs fire protection.
  • Approved Document K (Protection from falling): staircases, handrails, balustrades and edge protection.
  • Approved Document M (Access): how people, including disabled people, can reach and use the new floor, particularly where it will be used as office or customer space.

Depending on what goes on and under the mezzanine, other parts can apply too, such as lighting, ventilation and electrical safety for offices built on the new level.

Do you need a full plans application or a building notice?

For a mezzanine in commercial premises, you need a full plans application. The quicker building notice route is not available for this kind of building.

With full plans, drawings and calculations are checked before work starts; with a building notice, work is simply inspected as it goes along. Regulation 12 of the Building Regulations 2010 requires full plans for work on buildings covered by the Regulatory Reform (Fire Safety) Order 2005, which applies to virtually all non-domestic premises. Warehouses, offices, shops and workshops therefore all go down the full plans route. As part of that process, Building Control will normally consult the local fire and rescue authority, which in the capital is the London Fire Brigade.

Who can approve the work?

In England you can use either the local authority Building Control team for the area (in London, that means the borough where the building is) or a Registered Building Control Approver, the private-sector alternative. Both check the design against the regulations, inspect the work on site and issue a completion or final certificate when everything is satisfactory.

What does Building Control need to see?

Building Control needs enough detail to check structure, fire safety and access before approving the design. A well-prepared full plans submission typically includes:

  1. Layout drawings. Plans and sections showing the mezzanine, its size and height, column positions and how it relates to existing exits, racking and doors.
  2. Structural calculations. Prepared for the intended use and floor loading, together with details of the existing slab and the column base plates.
  3. Fire strategy. Escape routes, travel distances, staircase locations, fire protection to steelwork where needed, and how people on the mezzanine will be warned of a fire.
  4. Stair and edge protection details. Stair widths, rises and goings, handrails and balustrade heights, plus any pallet gate for loading.
  5. Access arrangements. Particularly important for office and retail mezzanines that staff or customers will use every day.

How does fire safety affect a mezzanine design?

Fire safety is usually what decides the final layout. The size of the mezzanine, how far someone on it would have to travel to reach a staircase, and what it is used for all influence whether one staircase is enough or a second is needed. They also decide whether the columns and underside need fire protection, such as fire-rated ceilings, boarding or column casings.

Offices on a mezzanine generally need more protection than a simple storage platform, because people spend long periods there and may not notice a fire starting below. It is also worth checking whether the mezzanine affects existing smoke detection, sprinklers or emergency lighting in the building.

What is the difference between Building Regulations and planning permission?

They are two separate systems, and a mezzanine is assessed under each one independently. Planning looks at how land and buildings are used and how they affect the area. Building Regulations look at how the work is built and whether it is safe.

QuestionBuilding RegulationsPlanning permission
What it checksStructure, fire safety, escape, access, protection from fallingUse of land, external appearance, impact on the area
Usually needed for a mezzanine?Yes, in almost all casesOften not for internal works, but there are exceptions, so check with the council
Who decidesLocal authority Building Control or a Registered Building Control ApproverThe local planning authority

If you rent your premises, also check your lease. Most commercial leases require the landlord’s written consent for alterations, and your landlord may ask to see the Building Control approval.

What happens after the mezzanine is installed?

You receive a completion certificate and should update your fire risk assessment before the floor is used. Once Building Control is satisfied, it issues a completion or final certificate. Keep it safe, as you will need it if you sell or re-let the building, make an insurance claim or are asked about the work by the landlord or fire authority.

As GOV.UK’s workplace fire safety guidance explains, the responsible person for non-domestic premises (an employer, owner, landlord or occupier) must carry out a fire risk assessment and review it regularly. Adding a mezzanine is a significant change to the building, so update the assessment, staff fire procedures and evacuation plan before the new floor comes into use.

You can find out more about how mezzanines are designed and installed on our mezzanine floors in London and across the UK page.

Frequently asked questions

Does a small storage mezzanine still need Building Regulations approval?

In most cases, yes. Even a modest storage platform adds a structure people walk on and affects escape routes. If you are unsure whether your project counts, ask Building Control before ordering steelwork.

Can work start before approval is granted?

For a mezzanine in commercial premises, you should not start work until the full plans application has been submitted and the design is accepted. Starting early risks having to alter or remove parts of the structure.

What happens if a mezzanine was installed without approval?

It can cause problems with insurance, leases and future sales, and the local authority can take enforcement action. A regularisation application may be possible for work carried out by a local authority route, but it can involve opening up the structure for inspection.

Do the rules differ in London?

The Building Regulations are the same across England. The practical differences are that Building Control is handled by the relevant London borough or a Registered Building Control Approver, and the London Fire Brigade is the fire authority consulted on the fire safety design.

Planning a mezzanine for your premises?

Getting the approvals right from the start saves time and avoids costly changes on site. Mike Falcon installs mezzanine floors in London and across the UK. Request a quote, send a WhatsApp message to 07384 418760 with photos and dimensions of your building, or get in touch to talk through your plans.

Client feedback

What our clients say